Sponsor: Deutsche Bundesstiftung Umwelt
Funding period: 20.08.2002-19.08.2003
Funding program and characteristics: 19823
Partner:
- Protronic GmbH
- TU Dresden ET
- Deutsche Bundesstiftung Umwelt
Project aim:
- Energy savings up to 50% by operating point adjustment
- Elimination or minimization of …noises
- Use of economic asynchronous machines without starting or operating capacitors and thus the elimination of the laborious “Blechabstimmung”
- Assurance of the “spontanen Leistungsangebotes”
- Strong reduction of the pump and engine temperature und thus increase of the lifetime
- improvement of the final total pressure ot the pumps by a low oil temperature