Protronic controlling system LSM6 in use
Light controlling system LSM6 is in use in the new RHÖN-Klinikum Campus Bad Neustadt.
The RHÖN-Klinikum AG describes the project as follows:
„ The new construction of the RHÖN-KLINIKUM Campus Bad Neustadt is a milestone and example for an efficient an future orientated health care in the rural area. Divided in 3 construction phases: a centre for clinical medicine (ZKM) and 2 further centres for ambulatory medicine and rehabilitative medicine as well as infrastructure facilities will be built.
The ZKM is the biggest new construction project on the site. Therefor the building area had to be completely new developed. In December 2015 the groundbreaking ceremony took place. Since then for the new clinic building 45.000 cubic meters of concrete and 7.000 tons of reinforcing steel have beed used.”
In these centres the LSM6 widely controls the lighting of the corridor areas. The LSM6 is directly connected with the BMS which sends signals to adjust time-related the light intensity. Furthermore a manual intervention is possible at any time. This is realised by the overlaying of light scenes.